Where is there headroom?
Start at the point of connection. Lower regional demand can point to promising hours; local equipment and network limits determine what can fit there.
DIGITAL ENERGY CAPACITY
The capacity available for new demand at a grid connection can rise and fall throughout the day. Digital Energy Capacity measures how much of that headroom a specific workload could use, where, and for how long.
THE MEASURE
Developed within Ex³ Energy’s Computational Energy Framework, DEC estimates how much additional load a grid can accommodate at a given location and over a defined period, subject to grid limits and the workload’s operating requirements.
Start at the point of connection. Lower regional demand can point to promising hours; local equipment and network limits determine what can fit there.
Separate protected load from work you can schedule. Account for deadlines, interruptions and any rebound demand when that work resumes.
Compare an earlier flexible phase with waiting for firm service. Identify the required hours, limits and fallback, and verify them against utility service terms.
THE ENGAGEMENT
Our first application: Texas data center development.
Compare firm, phased and flexible options. See which workloads a first phase could support and what to verify before committing IT capacity or a handover date.
See which power terms and tenant requirements support each option, who can close each open item, by when, and what to do if it slips.
We agree the fee up front. Delivery is five business days after we receive the complete, authorized inputs agreed in scope.
ILLUSTRATIVE EXAMPLE
At this connection point, available capacity is 4 MW overnight, 2 MW in the morning and evening, and 0.5 MW in the afternoon. Compare two ways of using 24 MWh in a day.
Hypothetical meter-level example. Both profiles assume all electrical loads are already included. A live review tests the limits, service terms and workload requirements for the actual site.
FITS THE ILLUSTRATIVE WINDOW
24 of 24 MWh
4 MW × 6 hours. All the work fits before 06:00, assuming it can run entirely in that window.
THE PRODUCT WE’RE DEVELOPING
We’re starting with project reviews in Texas. The longer-term goal is a DEC engine that system operators and large loads can use across markets to compare usable capacity windows under local constraints and rules.
Evaluate whether schedulable computing can run in an earlier phase while protecting always-on workloads.
Compare charging schedules that respect connection limits and still meet vehicle departure targets.
Test whether energy-intensive batches can move without missing production deadlines or interrupting continuous processes.
For grid operators and utilities: We’re interested in pilot partners to test how local grid limits, connection terms and real load profiles can be evaluated together. Discuss a pilot.